UCDNet2 Network Expansion Completed; Outlying Campus Locations Now Connected

The UCDNet2 campus network expansion project was recently completed, on time and within budget. The project managers have closed out all tasks for the UCDNet2 project, which included transmitting the various test results and as-built drawings, and updating the appropriate databases with the UCDNet2 information. The UCDNet 2 project's goal was to extend network infrastructure to a number of campus locations outside the scope of Network 21 and to connect outlying campus areas such as Research Park (southeast of I-80) and west of Highway 113. The infrastructure of the UCDNet2 project is a combination of fiber optic cable, wireless and traditional copper wire.